Wow, this project was like DIY sos. We had to compete this within the timeframe of the clients holiday .
All stripped out, rewired, replastered , the floors then tiled and finally first paintwork done.
The kitchen was then installed , lovely real oak painted Shaker doors with contrasting solid oak worktops simply oiled with Danish oil. The splash backs then tiled. Final paint touch up a good clean and done!! All competed within 12 days including a weekend, when the pressures on JPL Designs deliver , 1 company from start to finish! Now taking orders well into October so contact us if you need a anything before Christmas!!!!